How good are your Numbers: Accuracy and Precision in Cost Estimating.

In construction and project management, the importance of accurate and precise cost estimation cannot be overstated. Whether a general contractor works a small residential renovation or a large-scale commercial construction project, the success of their projects is often dependent on the ability to estimate costs effectively and efficiently. However, when discussing cost estimates, a common misunderstanding persists between the terms accuracy and precision. While they are sometimes used interchangeably, they represent different aspects of the estimating process and can have significant implications for project success.

This article explores the difference between accuracy and precision, their impact on cost estimating, and how professionals in the construction industry can balance both to enhance project outcomes.

Accuracy in Cost Estimating: The falsification criteria of the outcome

Accuracy in cost estimating refers to how close the estimate is to the actual cost of the project. In practice, an accurate estimate will align closely with the final cost after the project is completed. This alignment is very sensitive for budgeting, funding, and resource allocation. Executives set spending goals and want them achieved with less variance. An inaccurate estimate can lead to significant issues, such as:

  • Cost Overruns: Underestimating costs may result in insufficient funding to complete the project, leading to delays, additional financial strain or even project failure.

  • Budget Excess: Overestimating costs can tie up funds unnecessarily, reducing capital that could be invested in other areas of the business.

As a cost engineer or a general contractor, you do not want neither to underestimate nor to overestimate, you need to have an accuracy in your cost estimates. Achieving accuracy requires reliable data, historical cost records, and a deep understanding of the project's requirements through and an effective communication with stakeholders. It also involves incorporating contingency plans for unexpected expenses, escalation fees for price fluctuation and consideration of the impact of external factors such as labor shortages and climatic conditions.

The goal of accuracy in cost estimating is to ensure that all assumptions and variables are closely aligned with real-world conditions. For instance, if an initial cost estimate for a tenant improvement project in a commercial office building is estimated at $2.5 million, and the final cost comes to $2.4 million, the estimate would be considered highly accurate. In the construction industry, there are different level of accuracy in cost estimate and different classes of cost estimates.

Precision in Cost Estimating: The falsification criteria of the input and process

Precision in cost estimating refers to the consistency or repeatability in estimates. When an estimator provides similar results from multiple calculations or when multiple estimators or contractors arrive at similar values using the same data, the estimate is considered precise. Precision focuses on the reliability of the estimating process rather than how close it is to the final cost. Precision in cost estimates indicate a high degree of consistency in the estimation process.

Precision is generally achieved through:

  • Standardized estimation methods: Using the same normalized calculation methods, cost estimating templates, software, or tools for every project can lead to precise, repeatable results.

  • Detailed documentation of assumptions and inputs: By clearly defining the parameters of the estimate, including labor productivity rates, material takeoffs, and contingency allowances, cost estimators can replicate their results more easily.

However, it is important to note that precision without accuracy can be misleading. For instance, if five cost estimators or contractors generate five cost estimates for a construction project, all of which fall within a narrow range of $3.5 million to $3.7 million, but if the actual cost ends up being $4.5 million, it can be said that estimates were precise but not accurate. In this case, if one assumes a consistent estimation methods used by those contractors, it is possible to suspect issues with inputs such as an unclear documentation provided to them.

A precise estimate demonstrates that the cost estimation process is robust, and repeatable, and minimizes variability. This consistency builds trust in the process and ensures that stakeholders can rely on the estimate for decision-making. Precision ensures consistency, but accuracy ensures that the estimate is close to the actual cost. Inconsistent and imprecise estimates can erode stakeholder trust, making it harder to secure approvals or financing.

Conclusion

In cost estimating, accuracy and precision are important, they are characteristics of how good a cost estimate is. Accuracy ensures that the estimated costs align with the actual project costs, reducing the risk of budget overruns or underfunding. Precision, on the other hand, ensures that the estimating process is reliable and consistent, increasing confidence in the results.

To maximize both accuracy and precision, project managers and estimators should focus on gathering detailed, real-world data, applying consistent estimation methodologies, and leveraging technology to enhance both processes. Ultimately, whether it’s a major commercial development or a small residential renovation, accurate and precise cost estimates are the foundation upon which successful projects are built.

Looking to elevate your next construction project?

Reach out to Xenofan Consultants Constructions today for a FREE Consultation and see how our expertise can turn your vision into reality. From planning to execution, your project delivery experience is our priority.

Précédent
Précédent

Les agrandissements de maison : Horizontal ou vertical, quelle option choisir pour votre domicile ?

Suivant
Suivant

Estimation classe D et PFT – Programme fonctionnel et technique: Ce qu’il faut savoir